This job consisted of reclamation of Rip Rap, Storm drain removal, temporarily
redirecting creek in work area. Creating emergency environmental plan and storm water plan to cover all the work area. The remove and replace embankment for the abutment on the new bridge installation. Preparation and drilling of drill shafts. After bridge construction, placement of base material and paving. Project finished ahead of schedule to allow major traffic flow to
return to normal.